Проект распределенного фотоэлектрического оборудования на крыше мощностью 1 МВт компании Shuangsheng Cable в зоне экономического развития

Project Overview: Located in Weinan Economic and Technological Development Zone, the project uses about 6,000 square meters of rooftops of factory buildings and office buildings to build a 1MW distributed photovoltaic system with an investment of about 4 million yuan. The annual power generation exceeds 1.2 million kWh, which can reduce carbon emissions by about 1,000 tons.

Technical advantages: The photovoltaic cable adopts double-layer supply one-time molding technology, which is resistant to low temperature – 40℃ and high temperature + 120℃, meeting the complex climatic conditions in the northwest region.